Ashdod Stadium – two 16-ton cranes | Ken HaTor

At the new municipal stadium in Ashdod, RMA installed two 16-ton tower cranes: an MDT368 at about 40 m and an MD365 at 51.4 m, both with 75 m jibs covering the stadium arc.
Both erections took place in July 2023 according to dedicated site-organisation plans and risk surveys, and the cranes served the stadium’s structural works for more than a year.