Winter in Israel brings days of strong wind and storms, and a tower crane is one of the structures most exposed to wind on a building site. Preparing properly before the storm and inspecting methodically afterwards are a basic part of managing site safety. In this article we explain how wind affects a tower crane, who decides when to stop work, and what to do before and after a storm.
A tower crane is built to withstand wind loads, but only within the conditions the manufacturer has defined. Wind acts on the crane in several ways:
It is important to remember that wind at jib height is usually stronger than wind at ground level. What feels like a light breeze next to the site manager’s cabin can be a much stronger wind at the top of the crane.
The decision to stop work in wind is not a matter of feel. It rests on three sources:
We do not publish general wind-speed figures here, because they differ from model to model. The binding values must be taken from the data sheet and the manufacturer’s instructions for the specific model. The regulations prohibit working in dangerous wind but do not state a number.
Because wind changes with height, the relevant measurement is at jib height, not on the ground. For this, an anemometer is fitted at the top of the crane, showing the operator the wind speed and warning when it approaches the limit. A smart wind vane adds the wind direction to the measurement and can keep a history of readings. Advanced systems can combine the wind data with the crane’s safety systems, so that the site manager also receives an alert. Details of the safety systems RMA integrates are on the anti-collision systems page.
When the crane is not working, the jib should be free to turn with the wind, like a weathervane. In this state the jib lines up with the wind direction and the load on the structure is smaller. So at the end of the working day, and certainly before a storm, the slewing mechanism must be set to free mode according to the manufacturer’s instructions.
It is best not to wait for the first forecast. Before the season, it is recommended to check that the anemometer is working and calibrated, that the free-slewing mechanism works properly, that drainage around the base prevents water from collecting, and that everyone on the team is clear on who decides to stop work and how the crane is put into its out-of-service condition.
Before returning to work, the crane operator carries out the daily inspection as usual, and after a storm special attention should be paid to the following points:
If there is any unusual finding or doubt, do not operate the crane until it has been checked by a professional service team and, where necessary, by a certified inspector. As of 2026, RMA provides ongoing service to about 500 cranes across the country, with a team of 60 staff, technicians and engineers. Details are on the technical service for cranes page, and more information is in the article How to maintain a tower crane: a guide for contractors. To request a service call, phone 08-9202882 or send a WhatsApp message.
There is no single figure for all cranes. The wind limits are set for each model in the manufacturer’s data sheet, and the regulations and the instructions of those responsible on site also apply. Follow the values for the specific model.
It is a free-slewing mode in which the jib can turn with the wind like a weathervane. The jib then lines up with the wind direction and the load on the structure is smaller. The crane is set to this mode at the end of work and before a storm.
No. Tying the jib prevents it from turning with the wind and can greatly increase the load on the crane. Leave the slewing mechanism in free mode according to the manufacturer’s instructions.
Because wind at height is usually stronger than at ground level. An anemometer at the top of the crane shows the operator the conditions at the actual working height.
The base, the ties to the building, the counterweights, the jib and mast structure, and the electrical and safety systems, followed by a trial run without a load. If in any doubt, call for a professional inspection.
The site manager and the crane operator, based on the wind measurement, the manufacturer’s data sheet and the regulations. An operator who cannot control the load safely must stop even if the reading is below the limit.
The information in this article is general only and is not engineering, safety or legal advice. Before any decision, follow the manufacturer’s instructions and the applicable law, and consult certified professionals.